APARNA A from NALGONDA is requesting funding for equipment
$1,120 Requested
$1,118 Remaining
Ends in 55 days
APARNA A
TSMS GURRAMPODE
NALGONDA, Telangana
Up. Pr. Secondary and Higher Sec(6-12)Equipment
Students that will be reached.
Donor Have Contributed to This Project
About The Project
As the school functions for secondary & higher secondary classes the monitoring of the students will be difficult. The student teacher ratio is also very high. To avoid disciplinary issues continuous monitoring is needed and which is possible only through observation .With huge strength continuous monitoring will be difficult unless cameras are installed in all the class rooms. Everyday 16 classrooms, principal room, labs i.e. almost 20 to 25 rooms are in functioning during the school hours .So to avoid uncomfortable situations monitoring at the base root is essential .For that cc cameras installation is required and hence we shall be obelized if you could render the service to us.
Project Breakdown
Name | Cost | Quantity | Total |
---|---|---|---|
Cc Cameras | $54 | 20 | $1,080 |
Shipping
$14Sales Tax
$27Total
$1,120